I don’t assume how much longer this is going to take to be honest, however I’m not sure if I can keep going into the office knowing that I’m going to be overheated plus sluggish for the whole shift
Lately at the office, I have been feeling irritated. It’s not because of the labor both of us have been doing, however rather it’s the lack of cooling. About a week ago, the A/C plan abruptly started having trouble cooling down the office environment. The management seemed to not care, plus I figured that was because they had their own portable A/C systems in their offices. The rest of us have to deal with the overheated conditions plus were expected to keep up with productivity, and everybody was sluggish though thanks to the nearly non-existent A/C in the building. All of us eventually started complaining plus finally the management said they would look to find a nice Heating plus A/C corporation to take care of the A/C issue. Well, they have been taking their sweet time because both of us have yet to see an Heating plus A/C company in the building. I don’t assume how much longer this is going to take to be honest, however I’m not sure if I can keep going into the office knowing that I’m going to be overheated plus sluggish for the whole shift. I assume I might have to take some getaway time or something until this issue is fixed. I assume a few of our co-workers already did that plus they said they easily hope the A/C plan will be repaired plus working again by the time they come back to work… Of course, if I don’t ask to use our getaway time soon, they won’t let me because too numerous others are using their getaway time. I assume I’ll be speaking with the boss again soon.